Making life better through responsible consumption of electrical energy.

 
 
 

News March 2011

Comanche Reservoir Generator Engine Replacement

A little while ago, we went up to the Comanche Reservoir area to replace the engine on a generator. It was so remote that snowmobiling was our transportation of choice.
Here are some pictures from our little adventure:

Loaded up and ready to sled in.
Loaded up and ready to sled in

Arrived on site with the motor

104 Weeks (2 Years) Accident Free!

 
We are so pleased to announce that Collins Control & Electric recently passed the 104 Week (2 Year) mark for being accident free!  To celebrate we all went out to breakfast at the Silver Grill Cafe (not pictured).
Here's to another 104 Weeks!